Where else could it go?
Drop the Longmarsh Green Energy scheme on any spot in Britain. Official maps show what is in the way.
The challenge: find a spot with nothing major in the way.
Can you find somewhere better?
People keep asking why it cannot go somewhere else. Try it. Find a spot in Britain for the whole scheme with nothing major in the way.
How big is it, really?
- 2,700
- football pitches would fit in the whole scheme (1,900 hectares, at 105 m by 68 m a pitch)
- 4.4 km
- along each side if the scheme were one square, about a 52-minute walk at 5 km an hour
- 3.2 million
- homes use as much electricity in a year as the data centre would at full draw all year (1,000 MW, against a typical home's 2,700 kWh). Real sites run below full draw.
What it would be drawing right now
Fetching live grid figures.
- Britain is using
- –
- Sunlight at the site
- –
- Grid is mostly
- –
The data centre figure is its stated maximum; real sites usually run below it. The solar figure is an estimate from sunlight measured at the site, not metered output. How this is worked out
Get told when something changes
Have your say, whichever side you are on
The developer's consultation closes on Thursday 26 November.