People keep asking why it cannot go somewhere else. Try it. Find a spot in Britain for the whole scheme with nothing major in the way.

How big is it, really?

2,700
football pitches would fit in the whole scheme (1,900 hectares, at 105 m by 68 m a pitch)
4.4 km
along each side if the scheme were one square, about a 52-minute walk at 5 km an hour
3.2 million
homes use as much electricity in a year as the data centre would at full draw all year (1,000 MW, against a typical home's 2,700 kWh). Real sites run below full draw.

How close is it to my postcode?

What it would be drawing right now

Fetching live grid figures.

Data centre at full draw1,000 MW
Solar farm right now, estimated–
Britain is using
–
Sunlight at the site
–
Grid is mostly
–

The data centre figure is its stated maximum; real sites usually run below it. The solar figure is an estimate from sunlight measured at the site, not metered output. How this is worked out